Project Examples
©2024 Heiner Sträßer
Archaeologic excavation of Nerik:
Since 2009 the excavation is working in this well. As its depth is unknown, it needs a stabilization to prevent it from collapsing. This is done with a strong wooden construction that allows enlargement according to the needs of the excavation.